Category: Construction and Property Developers, Air Quality Assessments

Air quality monitoring

Aether was commissioned by Berkeley Homes to undertake an air quality assessment for the proposed installation of gas fired boilers at 250 City Road.

Aether was commissioned by Berkeley Homes to undertake an air quality assessment for the proposed installation of gas fired boilers at 250 City Road. Dispersion modelling was undertaken and a ‘slightly adverse’ impact on local nitrogen dioxide concentrations was found at worst case locations. Other pollutants were not of concern. One uncertainty in the modelling was the background nitrogen dioxide concentrations, as the data obtained from the nearby background monitoring station differed to that obtained from the Defra background concentration maps. In addition, the current pollution contribution from City Road was also uncertain. Therefore a nitrogen dioxide monitoring survey using diffusion tubes was commissioned to determine the current pollution levels at various points around the development site.

The challenge

At the time of monitoring, the area was a building site and therefore none of the buildings that will be constructed as part of the development were available for monitoring at. The site also needed to be clear of obstructions. Therefore the diffusion tubes were placed around the perimeter of the development site and from this interpolations had to be made.

The solution

Five diffusion tubes were exposed at the extremes of the site for periods of between 4 and 5 months in accordance with the UK Nitrogen dioxide survey timetable. One location was at first floor level to provide an indication of concentrations above ground level.

The result

The results indicated that concentrations exceeded the annual mean nitrogen dioxide objective in some residential locations close to City Road, which confirmed the indications provided by the dispersion modelling. Therefore, the installation of NOx/NO2 filters was recommended at these locations.

See all case studies

Melanie Hobson

Director

Related case studies

Residential Air Quality Assessment, Dartford

Category: Construction and Property Developers, Air Quality Assessments

A case study of the Air Quality Assessments Aether delivers for residential developments, here for a proposed development in Dartford.

Read case study

Industrial air quality assessment

Category: Construction and Property Developers, Air Quality Assessments

Aether was commissioned by Ballymore to undertake an air quality assessment for a proposed energy centre in phase 2 of the development at Royal Wharf in the London borough of Newham.

Read case study

Residential AQA, Westbourne Park in London

Category: Construction and Property Developers, Air Quality Assessments

Aether was commissioned to undertake an air quality assessment, air quality neutral assessment and construction dust assessment for a proposed large residential development on Edenham Way in Westbourne Park in London.

Read case study

News

Latest news

Posted on: 18 May 2026

Power Query Workshop in Estonia

Aether travelled to the Estonian Environmental Research Centre (EKUK) in Tallinn to deliver a two-day training workshop for the inventory team to build capacity on the Excel power queries used in the GHG inventory templates previously set up by Aether in 2022.

Read full story

Posted on: 30 April 2026

Capacity Sharing in Saint Vincent and the Grenadines

Aether delivered a three-day GHG inventory capacity building workshop in Saint Vincent and the Grenadines, towards development of the BTR1.

Read full story

Posted on: 17 March 2026

Central Asia Study Tour: Air Quality Workshop

Aether provided representatives from Central Asia (Kyrgyzstan, Tajikistan, Turkmenistan, Uzbekistan and Kazakhstan) who were visiting the UK on a study tour with an introduction to air quality management.

Read full story

Posted on: 26 February 2026

Pakistan Training Workshop on Monitoring, Reporting and Verification (MRV), Carbon Markets, and Article 6 Mechanisms

Aether staff delivered a workshop in Islamabad, Pakistan on the fundamentals of MRV and GHG inventories.

Read full story

Testimonial

Don't just take our word for it...

“ I must congratulate each of you for your professional and tireless efforts. Let me point out that this has been the 'neatest' in-country review expert review team I have coordinated, and it has been a real pleasure. ”

UNFCCC Secretariat

“ If we have a need for any more reports in the future Aether will be first on my list. ”

Alan Hardy, Kyson Design

“ Professional team and very collaborative communication. Effective result in terms of suggestions for improvement in the quality of the inventory and proposals on how to streamline specific topics. ”

Italian Institute for Environmental Protection and Research

“ Engaging Aether to support us to develop the first GHG Inventory System and first Nationally Determined Contribution (NDC) for the United Republic of Tanzania has been a rewarding experience due to their high level of professionalism, creativity, timeliness and value for money. We will definitely consider Aether in our future initiatives. ”

Abbas Kitogo, Programme Specialist Energy and Climate Change, UNDP Tanzania

“ It is always an absolute pleasure working with Aether. I always know what is expected of me. Their work ethic is of a very high standard and projects are always handled in a very professional manner. I have learnt many skills in terms of project management, quality control and workshop training styles from Aether and I hope to carry these principles forward in my own work. I look forward to collaborating with Aether more in the future. ”

Luanne Stevens, Gondwana

“ The Aether team were a joy to work with and I would recommend the consultancy - the service provided throughout the process was exceptional. ”

Clare Bayley, Defra