Category: Construction and Property Developers, Air Quality Assessments

Air quality monitoring

Aether was commissioned by Berkeley Homes to undertake an air quality assessment for the proposed installation of gas fired boilers at 250 City Road.

Aether was commissioned by Berkeley Homes to undertake an air quality assessment for the proposed installation of gas fired boilers at 250 City Road. Dispersion modelling was undertaken and a ‘slightly adverse’ impact on local nitrogen dioxide concentrations was found at worst case locations. Other pollutants were not of concern. One uncertainty in the modelling was the background nitrogen dioxide concentrations, as the data obtained from the nearby background monitoring station differed to that obtained from the Defra background concentration maps. In addition, the current pollution contribution from City Road was also uncertain. Therefore a nitrogen dioxide monitoring survey using diffusion tubes was commissioned to determine the current pollution levels at various points around the development site.

The challenge

At the time of monitoring, the area was a building site and therefore none of the buildings that will be constructed as part of the development were available for monitoring at. The site also needed to be clear of obstructions. Therefore the diffusion tubes were placed around the perimeter of the development site and from this interpolations had to be made.

The solution

Five diffusion tubes were exposed at the extremes of the site for periods of between 4 and 5 months in accordance with the UK Nitrogen dioxide survey timetable. One location was at first floor level to provide an indication of concentrations above ground level.

The result

The results indicated that concentrations exceeded the annual mean nitrogen dioxide objective in some residential locations close to City Road, which confirmed the indications provided by the dispersion modelling. Therefore, the installation of NOx/NO2 filters was recommended at these locations.

See all case studies

Melanie Hobson

Director

Related case studies

Residential AQA, Westbourne Park in London

Category: Construction and Property Developers, Air Quality Assessments

Aether was commissioned to undertake an air quality assessment, air quality neutral assessment and construction dust assessment for a proposed large residential development on Edenham Way in Westbourne Park in London.

Read case study

Industrial air quality assessment

Category: Construction and Property Developers, Air Quality Assessments

Aether was commissioned by Ballymore to undertake an air quality assessment for a proposed energy centre in phase 2 of the development at Royal Wharf in the London borough of Newham.

Read case study

Residential Air Quality Assessment, Dartford

Category: Construction and Property Developers, Air Quality Assessments

A case study of the Air Quality Assessments Aether delivers for residential developments, here for a proposed development in Dartford.

Read case study

News

Latest news

Posted on: 10 September 2026

Rail Freight Group award win

Aether were the winner in the Innovation category at the Rail Freight Group Annual Awards. The award recognises two RSSB research projects which are already delivering improvements for the rail freight sector.

Read full story

Posted on: 19 June 2026

NECD Review Week in Brussels

Aether spent a week at the European Commission in Brussels as part of the review of air pollutant inventories submitted under the EU’s National Emission reduction Ceilings Directive (NECD).

Read full story

Posted on: 18 May 2026

Power Query Workshop in Estonia

Aether travelled to the Estonian Environmental Research Centre (EKUK) in Tallinn to deliver a two-day training workshop for the inventory team to build capacity on the Excel power queries used in the GHG inventory templates previously set up by Aether in 2022.

Read full story

Posted on: 30 April 2026

Capacity Sharing in Saint Vincent and the Grenadines

Aether delivered a three-day GHG inventory capacity building workshop in Saint Vincent and the Grenadines, towards development of the BTR1.

Read full story

Testimonial

Don't just take our word for it...

“ The professional service provided by your company was of very high quality and completed within agreed timelines. ”

Matthew Dudley, UNFCCC Secretariat

“ We have been collaborating with Aether for several years, and our projects have greatly benefited from it. Aether staff are very knowledgeable, professional and flexible - and last but not least, very friendly and a pleasure to work with. ”

Umhverfisstofnun, Environment Agency of Iceland

“ The team at Aether works very professionally and communicates very well which makes working with them a pleasure. Outputs are delivered on time to high quality. The team brings the rigour of technical knowledge and expertise and finds innovative ways of communicating complex messages. I would be happy to recommend the Aether team to organisations working on analysing and presenting emissions information in the public domain. ”

Fiona Glover, States of Jersey

“ Chris was excellent to work with and always very pro active in making suggestions, taking work forward and applying his considerable technical knowledge in effective ways. ”

Robert Vaughan, Defra Air Quality Team

“ We have worked with Aether since 2019 to baseline, and subsequently update, our council and borough greenhouse gas inventories. It is a pleasure working with Aether’s professional, responsive, collaborative and helpful team. ”

Merton Council

“ A heartfelt thank you to all the Aether team for this very comprehensive review – this is certainly turning out to be one of the most beneficial capacity building projects I have ever been involved in. ”

Saviour Vassallo, Senior Environment Protection Officer, Malta Resources Authority